A brief history of the 2013-2014 paver road and drainage project. The drains (seven engineered drains) are drilled into the aquafers and have drain pipes out to the mangroves on either side of the subdivision.







September 2025 Juan Carlos Puga coordinated repairs with our new pavers at the south west corner of the subdivision.

